Ask Whether Any Walls Were Moved or Removed Before an Offer
The kitchen and dining room are one big room. The listing says “open plan” and nothing about a wall that once stood between them. A five-minute written question asks whether any walls were moved and by whom. The question is how likely a structure surprise is for the question to pay before you offer.
The steps
- Price the question: minutes × the value of your time.
- Price a structure surprise: engineering, repair and permit fees.
- Break-even chance = question cost ÷ surprise cost.
- Price unpermitted work honestly (unpermitted work: pricing the fix before you offer).
A worked example
Example (illustrative arithmetic, not predictions)
The question takes 5 minutes at $60 an hour: $5. A structure surprise costs $5,000 to engineer and repair. Every figure is a made-up round number.
| Chance of a structure surprise | Expected cost avoided (chance × $5,000) | Avoided − $5 |
|---|---|---|
| 0.05% | $2.50 | −$2.50 |
| 0.1% | $5 | $0 (break-even) |
| 0.3% | $15 | +$10 |
| 0.6% | $30 | +$25 |
The question pays at a 0.1% chance of a structure surprise: $5 ÷ $5,000. In an older house with an open plan, it is easily exceeded.
Ask in writing whether any walls were moved or removed, when, by whom and with what permit, and ask your inspector and an engineer to look at any open span. Do not assume a wall was not load-bearing.
Making it routine
- Ask in writing which walls were moved and when.
- Ask who did the work and what permit.
- Ask your inspector and an engineer to look.
- Do not assume a wall was not load-bearing.
Run your own numbers
Use the free MAO calculator below to see how an engineering fix changes the most you can offer.