Ask Whether the Seller Kept the Original Plans or Permits
The seller says a previous owner “did the addition”. Nobody has a drawing or a permit number. You would spend hours at the building department finding out. A five-minute question asks whether the seller kept a folder. The question is how likely the folder is to save you that hunt for the question to pay.
The steps
- Price the question: minutes × the value of your time.
- Price a records hunt: hours at the department and fees.
- Break-even chance = question cost ÷ hunt cost.
- Price any unpermitted work (unpermitted work: pricing the fix before you offer).
A worked example
Example (illustrative arithmetic, not predictions)
The question takes 5 minutes at $60 an hour: $5. A records hunt would cost $500 in time and fees. Every figure is a made-up round number.
| Chance the folder saves a hunt | Expected cost avoided (chance × $500) | Avoided − $5 |
|---|---|---|
| 0.5% | $2.50 | −$2.50 |
| 1% | $5 | $0 (break-even) |
| 3% | $15 | +$10 |
| 6% | $30 | +$25 |
The question pays at a 1% chance that the folder saves a hunt: $5 ÷ $500. For a house with past work, it is easily exceeded.
Ask in writing for plans, permits, inspection sign-offs and contractor names, and ask for copies before closing. Verify permits at the building department, whose records are what count.
Making it routine
- Ask in writing for plans, permits and sign-offs.
- Ask for contractor names.
- Ask for copies before closing.
- Verify permits at the building department.
Run your own numbers
Use the free MAO calculator below to see how a records hunt changes the most you can offer.