Buyer Inspection Requests: Repair It or Give a Credit?
The buyer’s inspection comes back and the list arrives: five items, $12,700 in credits. The list is the opening of a negotiation, not a bill. Pricing each item against what it really costs you turns a stressful day into a short table.
The steps
- Match each request to the inspection report.
- Get your own cost and time to fix each valid item.
- Decide: fix, credit, or decline, and note why.
- Total cost of fixing = repair costs + holding cost of the days it takes.
- Compare it with the total credits asked, and answer in writing.
A worked example
Example (illustrative arithmetic, not typical figures)
Holding cost $1,300 a month, about $43 a day (holding costs). A buyer asks for credits on five items. Every figure is a made-up round number.
| Item | Credit asked | Your cost to fix | Response |
|---|---|---|---|
| Roof flashing | $1,200 | $400 | Fix |
| HVAC service | $600 | $250 | Fix |
| Electrical panel | $3,500 | $2,800 | Fix |
| Foundation crack | $6,000 | $0 | Decline: an engineer’s note says it is cosmetic |
| Water heater | $1,400 | $900 | Fix |
| Total | $12,700 | $4,350 (for the four fixes) |
The four fixes cost you $4,350 against $6,700 of credits asked for the same items, a $2,350 saving. The repairs take about 10 days: 10 × $43.33 = $433 of holding cost. All in: $4,350 + $433 = $4,783, against $12,700 if you paid every credit. The difference is $7,917, most of it from declining the foundation item, which the report did not support. Declining it needed evidence, so get the engineer’s note first (pre-offer walkthrough).
Staying out of trouble
- Do not fix what you cannot support: keep the report, the second opinion and photos.
- Use licensed trades and keep invoices; the next buyer may ask (permits and inspections).
- Check that a delay does not threaten the closing date or the buyer’s financing (comparing offers).
- Record the result for your next sale (profit variance).
Run your own numbers
Use the free closing net sheet below to see what each choice does to what you walk away with.