Buyer's Premium at Auction: Set Your Max Bid Net of It
You worked out that the most you can pay for a house is $200,000. At auction you raise your paddle to $200,000 and win. The auction then adds a buyer’s premium, and you owe more than your maximum. The fix is to set the bid net of the premium before the auction starts.
The steps
- Work out your maximum all-in price from the deal, as for any purchase (the 70% rule and MAO).
- Find the buyer’s premium rate in the auction’s written terms.
- Divide the maximum all-in price by one plus the rate. That is the highest bid.
- Subtract any other fees the terms add, and recompute.
- Write the number down before the auction, and stop there (buying at auction).
A worked example
Example (illustrative arithmetic, not typical figures)
Your maximum all-in price is $200,000, and the auction adds a made-up 5% buyer’s premium. Every figure is a made-up round number.
Highest bid: $200,000 ÷ 1.05 = $190,476.
| Your winning bid | Premium (5%) | Total paid | Over your $200,000 maximum |
|---|---|---|---|
| $190,476 | $9,524 | $200,000 | $0 |
| $195,000 | $9,750 | $204,750 | $4,750 |
| $200,000 | $10,000 | $210,000 | $10,000 |
Bidding your maximum price instead of your maximum price net of the premium costs you $10,000. In a flip with a thin margin, that can be the whole profit. The premium is added after the hammer falls, and it is easy to forget in the heat of bidding.
A premium is only one cost. Many auctions require a deposit on the day, a closing within a short window, and purchase as is, with title and condition risks you have to price in advance. Read the written terms line by line, and ask a qualified attorney about title and the conditions of sale (unpermitted work pricing).
Making it routine
- Read the auction terms before the day, not at it.
- Write your maximum bid net of every fee on the paddle card.
- Stop at the number.
- Record what each auction purchase finally cost.
Run your own numbers
Use the free MAO calculator below to set the maximum all-in price you start from.