Buying at Auction: Fees, Liens and Surprises in the Math
An auction sets the price in minutes and leaves the due diligence to you. The spreadsheet that says the deal makes $59,200 may really say $24,200. The difference is the stuff the spreadsheet did not know about.
What to price before you bid
- Buyer’s fee added to the winning bid.
- Back taxes and other charges that follow the property.
- Liens that survive the sale; a title search can find them (title commitment).
- Occupants and the cost and time to remove them lawfully.
- Repairs beyond what you can see from outside (pre-offer walkthrough).
- Your usual buying, holding and selling costs (holding costs).
A worked example
Example (illustrative arithmetic, not market data)
Finished value $300,000, selling costs 8%, rehab $55,000, buying costs $4,000, holding cost $1,300 × 6 months. Winning bid $150,000. Every figure is a made-up round number.
| Item | Spreadsheet view | After auction costs |
|---|---|---|
| Net sale price ($300,000 × 0.92) | $276,000 | $276,000 |
| Bid | −$150,000 | −$150,000 |
| Rehab | −$55,000 | −$55,000 |
| Buying costs | −$4,000 | −$4,000 |
| Holding (6 × $1,300) | −$7,800 | −$7,800 |
| Buyer’s fee (5% of bid) | −$7,500 | |
| Back taxes | −$4,500 | |
| Surviving lien | −$8,000 | |
| Removing an occupant | −$3,000 | |
| Repairs found after purchase | −$12,000 | |
| Profit | $59,200 | $24,200 |
The auction costs add $35,000, 23.3% of the bid, and cut profit by 59%. Most of this was knowable: the fee from the auction terms, taxes and liens from a title search.
A maximum bid. To keep $40,000 of profit with the same costs: bid × 1.05 = $276,000 − $27,500 (taxes, lien, occupant, repairs) − $55,000 − $7,800 − $4,000 − $40,000 = $141,700, so the maximum bid is $134,952, about 10.0% below the $150,000 bid (maximum allowable offer).
Bidding discipline
- Run the title search and drive-by before the auction, not after.
- Write the maximum bid down and do not go above it.
- Keep a reserve for surprises (cash reserve).
- Walk away from a property whose unknowns you cannot price (sensitivity table).
Run your own numbers
Use the free maximum allowable offer calculator below to test a bid against your profit target.