Wipe Down Switches and Door Handles Before Showings
A prospect pushes the front door open and flips the hall switch. The plate is gray with fingerprints. The rest is clean. A quick wipe of every switch and handle takes five minutes. The question is how likely a prospect is to pass over the grubby feel for the wipe to pay.
The steps
- Price the wipe: minutes × the value of your time.
- Price a passed prospect: extra days of vacancy.
- Break-even chance = wipe cost ÷ cost of the lost days.
- Replace yellowed plates too (replace yellowed switch and outlet plates).
A worked example
Example (illustrative arithmetic, not quotes or predictions)
The wipe takes 5 minutes at $60 an hour: $5. A passed prospect costs 2 extra vacant days at $50 a day: $100. Every figure is a made-up round number.
| Chance a prospect passes over the feel | Expected cost avoided (chance × $100) | Avoided − $5 |
|---|---|---|
| 2.5% | $2.50 | −$2.50 |
| 5% | $5 | $0 (break-even) |
| 10% | $10 | +$5 |
| 20% | $20 | +$15 |
The wipe pays at a 5% chance that a prospect passes over the feel: $5 ÷ $100. In a unit others have lived in, it is plausible.
Use a damp cloth, never spray a switch, switch the power off before cleaning near outlets and dry each plate. Do the front door handle and the first switch last, just before the showing.
Making it routine
- Use a damp cloth, never spray.
- Switch the power off near outlets.
- Dry each plate.
- Do the front door and first switch last.
Run your own numbers
Use the free BRRRR calculator below to see what each vacant day costs on your own rental.