Use the Same Warm-White Bulbs in Every Room Before Showing

By DeskTech HQ · · 1 min read

One room glows yellow, the next has a cold blue-white bulb and the hall is dark. Photos and showings make the unit look patchy. Matching warm-white bulbs costs about fifteen dollars and ten minutes. The question is how likely a prospect is to pass over the uneven light for the swap to pay.

The steps

  1. Price the swap: bulbs + minutes × the value of your time.
  2. Price a passed prospect: extra days of vacancy.
  3. Break-even chance = swap cost ÷ cost of the lost days.
  4. Pair it with working bulbs (leave working light bulbs at move-in).

A worked example

Example (illustrative arithmetic, not quotes or predictions)

The swap costs $15 of bulbs plus 10 minutes at $60 an hour ($10): $25. A passed prospect costs 2 extra vacant days at $50 a day: $100. Every figure is a made-up round number.

Chance a prospect passes over uneven light Expected cost avoided (chance × $100) Avoided − $25
12.5% $12.50 −$12.50
25% $25 $0 (break-even)
40% $40 +$15
60% $60 +$35

The swap pays at a 25% chance that a prospect passes over the light: $25 ÷ $100. Where a unit is shown in the evening, it is plausible.

Choose one color temperature for the whole unit, check each fixture’s maximum wattage and whether it is enclosed, and fit the same bulbs everywhere.

Making it routine

  1. Choose one color temperature.
  2. Check each fixture’s rating.
  3. Fit the same bulbs everywhere.
  4. Photograph the unit with lights on.

Run your own numbers

Use the free BRRRR calculator below to see what each vacant day costs on your own rental.

Quick answers

Why match the bulbs?

Mixed bulb colors make rooms look patchy and some look dingy.

How do I price it?

The bulbs plus the minutes to swap them.

What does a passed prospect cost?

Extra days of vacancy.

What is the break-even chance?

The work's cost divided by the cost of the lost days.

Do the numbers in this guide apply to my rental?

No. The costs, rents and odds are made up for the example. They are not quotes or predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.