Give the Front Door a Fresh Coat Before the Photos

By DeskTech HQ · · 1 min read

The listing photo leads with the front door. It is chipped, faded and has a dent from a delivery. A coat of exterior paint costs about fifteen dollars and half an hour with prep. The question is how likely a prospect is to pass over a tired door for the coat to pay.

The steps

  1. Price the job: paint + minutes × the value of your time.
  2. Price a passed prospect: extra days of vacancy.
  3. Break-even chance = job cost ÷ cost of the lost days.
  4. Wash the walkway too (pressure-wash the walkway and front steps).

A worked example

Example (illustrative arithmetic, not quotes or predictions)

The job costs $15 of paint plus 35 minutes at $60 an hour ($35): $50. A passed prospect costs 4 extra vacant days at $50 a day: $200. Every figure is a made-up round number.

Chance a prospect passes over the door Expected cost avoided (chance × $200) Avoided − $50
12.5% $25 −$25
25% $50 $0 (break-even)
40% $80 +$30
60% $120 +$70

The coat pays at a 25% chance that a prospect passes over the door: $50 ÷ $200. On a house that photographs from the street, it is plausible.

Test an older door for lead before scraping, clean and lightly sand a sound surface, prime bare spots and coat in dry weather. Remove the hardware or tape it carefully.

Making it routine

  1. Test an older door for lead.
  2. Clean and lightly sand a sound surface.
  3. Prime bare spots.
  4. Coat in dry weather.

Run your own numbers

Use the free BRRRR calculator below to see what each vacant day costs on your own rental.

Quick answers

Why paint the front door?

It is the first thing in the photos and the first thing a visitor touches.

How do I price it?

The paint plus the minutes to prep and coat the door.

What does a passed prospect cost?

Extra days of vacancy.

What is the break-even chance?

The job's cost divided by the cost of the lost days.

Do the numbers in this guide apply to my rental?

No. The costs, rents and odds are made up for the example. They are not quotes or predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.