Check Internet and Cell Signal Before an Offer

By DeskTech HQ · · 1 min read

A rental with one slow internet option or a dead zone for cell calls is harder to rent to people who work from home. Provider tools show what is available at an address, and a phone shows the signal. The check takes ten minutes. The question is how likely a problem is for the check to pay.

The steps

  1. Price the check: minutes × the value of your time.
  2. Estimate the loss from a connectivity problem: lower rent or longer vacancy.
  3. Break-even chance = cost ÷ loss.
  4. Compare with the tenants you aim for (estimating rent with comps).

A worked example

Example (illustrative arithmetic, not predictions)

The check takes 10 minutes at $60 an hour: $10. A connectivity problem would cost $2,000 in rent and vacancy over the hold. Every figure is a made-up round number.

Chance of a connectivity problem Expected loss avoided (chance × $2,000) Avoided − $10
0.25% $5 −$5
0.5% $10 $0 (break-even)
2% $40 +$30
5% $100 +$90

The check pays at a 0.5% chance of a connectivity problem: $10 ÷ $2,000. In a rural or edge-of-town address, the chance is much higher.

Enter the address in two or three providers’ tools, note the fastest option and what it costs, and stand in the living room and bedroom with a phone to check the signal. Advertised speeds are not guaranteed, so treat the result as a guide.

Making it routine

  1. Check two or three providers at the address.
  2. Note the fastest option and its cost.
  3. Test cell signal inside and outside.
  4. Compute the break-even chance for the deal.

Run your own numbers

Use the free MAO calculator below to see how a rent reduction changes the most you can offer.

Quick answers

Why check connectivity?

Tenants who work or study from home choose rentals by it.

How do I price the check?

The minutes times the value of your time.

What is the break-even chance?

The cost divided by the loss from a connectivity problem.

How do I check?

Use the providers' address tools and test cell signal on site.

Do the numbers in this guide apply to my deal?

No. The cost, loss and odds are made up for the example. They are not predictions.

Keep reading

Deal analysis

Ask About a Solar Lease Before an Offer: The Odds

Learn how to price a ten-minute check for a solar panel lease or financing lien on a roof before you offer and find the chance it exists that makes it pay.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.