Fix Squeaky Doors and Stairs at Turnover: The Odds
Squeaky hinges and creaking stairs are small things that tenants notice in the first week. A drop of oil on a hinge pin and a few screws in a tread take minutes at turnover. The question is how likely a complaint is for the job to pay.
The steps
- Price the job: the supplies plus the minutes.
- Price a complaint: the call, the trip and goodwill.
- Break-even chance = job cost ÷ complaint cost.
- Treat loose treads and rails as safety items (the cost of turnover).
A worked example
Example (illustrative arithmetic, not quotes or predictions)
The job costs $3 with time. A complaint would cost $40. Every figure is a made-up round number.
| Chance of a squeak complaint in the first month | Expected complaint cost avoided (chance × $40) | Avoided − $3 |
|---|---|---|
| 3.75% | $1.50 | −$1.50 |
| 7.5% | $3.00 | $0 (break-even) |
| 15% | $6.00 | +$3.00 |
| 30% | $12.00 | +$9.00 |
The job pays at a 7.5% chance of a complaint: $3 ÷ $40. In an older house with wood floors and stairs, the chance is much higher.
Open and close every door and walk every stair. Oil hinges, tighten hinge screws and drive trim screws through creaking treads into the stringers. A loose tread, rail or baluster is a safety matter, so have a contractor repair it and keep tenants off until it is fixed.
Making it routine
- Open and close every door.
- Walk every stair.
- Oil hinges and drive screws through loose treads.
- Have a contractor fix loose treads and rails.
Run your own numbers
Use the free BRRRR calculator below to see how small yearly costs per unit add up across a building.