Leave Appliance Manuals in a Folder: The Calls Prevented
A tenant cannot find the reset button on the dishwasher or the filter on the furnace and calls. Most manuals are online, but a short folder in a kitchen drawer answers it. Putting one together takes a few minutes per unit. The question is how likely a how-do-I call is for the folder to pay.
The steps
- Price the folder: the folder plus minutes to collect the sheets.
- Price a how-do-I call: the call, the trip and goodwill.
- Break-even chance = folder cost ÷ call cost.
- Add the shutoff locations to it (photograph the shutoffs at the first draw).
A worked example
Example (illustrative arithmetic, not quotes or predictions)
The folder costs $5 with time. A how-do-I call would cost $40. Every figure is a made-up round number.
| Chance of a how-do-I call in the first year | Expected call cost avoided (chance × $40) | Avoided − $5 |
|---|---|---|
| 6% | $2.40 | −$2.60 |
| 12.5% | $5.00 | $0 (break-even) |
| 25% | $10.00 | +$5.00 |
| 50% | $20.00 | +$15.00 |
The folder pays at a 12.5% chance of a call: $5 ÷ $40. With a furnace, a dishwasher and a water heater in every unit, one call in the first year is common.
Use the manufacturer’s quick-start sheets, print the model numbers from each appliance, and add the location of the main water shutoff, the breaker panel and the furnace filter. Keep it in the same place in every unit.
Making it routine
- Collect a sheet for each appliance.
- Add the shutoff and panel locations.
- Keep the folder in the same place in every unit.
- Update it when an appliance changes.
Run your own numbers
Use the free BRRRR calculator below to see how small yearly costs per unit add up across a building.