Clean Refrigerator Coils and Drip Pan at Turnover: The Odds
Dust on the coils behind a refrigerator makes it run hot. A fridge that fails brings a spoilage call and a replacement. Vacuuming the coils and washing the drip pan takes five minutes at turnover. The question is how likely a failure or spoilage call is for the job to pay.
The steps
- Price the job: minutes × the value of your time.
- Price a failure or spoilage call: the call, the repair or replacement and goodwill.
- Break-even chance = job cost ÷ call cost.
- Compare with the fridge’s age (appliance repair or replace: the repair cost cap).
A worked example
Example (illustrative arithmetic, not quotes or predictions)
The job takes 5 minutes at $60 an hour: $5. A failure or spoilage call would cost $200. Every figure is a made-up round number.
| Chance the dust causes a failure or call | Expected call cost avoided (chance × $200) | Avoided − $5 |
|---|---|---|
| 1% | $2 | −$3 |
| 2.5% | $5 | $0 (break-even) |
| 5% | $10 | +$5 |
| 10% | $20 | +$15 |
The job pays at a 2.5% chance that dust causes a call: $5 ÷ $200. For an older fridge in a unit with pets, the chance is higher.
Unplug the fridge, pull it out gently, vacuum the coils with a brush attachment, and empty and wash the drip pan. Check the door gasket and the floor underneath while it is out. Plug it back in, and leave room around it for air.
Making it routine
- Unplug and pull out the fridge.
- Vacuum the coils and wash the drip pan.
- Check the gasket and the floor underneath.
- Plug it in and leave room for air.
Run your own numbers
Use the free BRRRR calculator below to see how a small yearly cost per unit adds up across a building.