Clean the Gutters at Turnover: The Overflow Odds
Leaves fill the gutters. The next storm sends water over the edge and down the wall. Cleaning takes forty-five minutes. The question is how likely an overflow causing damage is for the cleaning to pay.
The steps
- Price the cleaning: minutes × the value of your time.
- Price overflow damage: fascia, siding or foundation water.
- Break-even chance = cleaning cost ÷ damage cost.
- Pair it with the branches (trim branches away from the roof and gutters).
A worked example
Example (illustrative arithmetic, not predictions)
The cleaning takes 45 minutes at $60 an hour: $45. Overflow damage costs $900 to repair. Every figure is a made-up round number.
| Chance of overflow damage | Expected cost avoided (chance × $900) | Avoided − $45 |
|---|---|---|
| 2.5% | $22.50 | −$22.50 |
| 5% | $45 | $0 (break-even) |
| 10% | $90 | +$45 |
| 15% | $135 | +$90 |
The cleaning pays at a 5% chance of overflow damage: $45 ÷ $900. Under mature trees, that is plausible.
Have someone trained and insured do the work off a ladder in good conditions, flush the downspouts and check that water flows. Hire a pro if you are not set up to work at height.
Making it routine
- Hire someone trained for work at height.
- Flush the downspouts.
- Check that water flows freely.
- Repeat each autumn.