Count Meters, Doorbells and Kitchens to Spot an Extra Unit

By DeskTech HQ · · 1 min read

The listing says single-family. The yard has two electric meters, two doorbells and a second kitchen in the basement. A ten-minute count looks for the signs. The question is how likely an unpermitted unit is for the count to pay before you offer.

The steps

  1. Price the count: minutes × the value of your time.
  2. Price an unpermitted unit: legalizing it, removing it or losing counted income.
  3. Break-even chance = count cost ÷ unit cost.
  4. Price the fix honestly (unpermitted work: pricing the fix before you offer).

A worked example

Example (illustrative arithmetic, not predictions)

The count takes 10 minutes at $60 an hour: $10. An unpermitted unit would cost $5,000 to legalize or remove. Every figure is a made-up round number.

Chance of an unpermitted unit Expected cost avoided (chance × $5,000) Avoided − $10
0.1% $5 −$5
0.2% $10 $0 (break-even)
0.6% $30 +$20
1% $50 +$40

The count pays at a 0.2% chance of an unpermitted unit: $10 ÷ $5,000. In an older multi-family area, it is easily exceeded.

Count the electric and gas meters, the doorbells and the mailboxes, look for a second kitchen or a separate entrance, photograph what you see and ask the building department what is permitted.

Making it routine

  1. Count the meters, doorbells and mailboxes.
  2. Look for a second kitchen or entrance.
  3. Photograph what you see.
  4. Ask the building department what is permitted.

Run your own numbers

Use the free MAO calculator below to see how losing counted income changes the most you can offer.

Quick answers

What are the signs of an extra unit?

Two meters, two doorbells, a second kitchen or a separate entrance.

How do I price the count?

The minutes times the value of your time.

What does an unpermitted unit cost?

Legalizing it, removing it or losing the income you counted.

What is the break-even chance?

The count's cost divided by that cost.

Do the numbers in this guide apply to my deal?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Deal analysis

Ask About a Solar Lease Before an Offer: The Odds

Learn how to price a ten-minute check for a solar panel lease or financing lien on a roof before you offer and find the chance it exists that makes it pay.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.