Cross-Check the Contractor Against Your Other Loans

By DeskTech HQ · · 1 min read

A contractor is behind on one of your loans. The same contractor is also on two others, with draws due this month. A five-minute search of your loan files for the name shows the exposure. The question is how likely shared trouble is for the check to pay.

The steps

  1. Price the check: minutes × the value of your time.
  2. Estimate the cost of shared trouble not seen in time.
  3. Break-even chance = check cost ÷ that cost.
  4. Pair it with your watch list (lender watch list: early warning signs).

A worked example

Example (illustrative arithmetic, not predictions)

The check takes 5 minutes at $60 an hour: $5. Shared trouble not seen in time would cost $1,000. Every figure is a made-up round number.

Chance a contractor is in trouble on another loan Expected cost avoided (chance × $1,000) Avoided − $5
0.25% $2.50 −$2.50
0.5% $5.00 $0 (break-even)
2% $20.00 +$15.00
5% $50.00 +$45.00

The check pays at a 0.5% chance of shared trouble: $5 ÷ $1,000. A lender whose borrowers use the same few contractors will see it often.

Keep a simple list of contractors by loan and search it before each new loan and when a contractor slips on one. Stick to facts in your own records, such as late draws and missed inspections, and do not share a contractor’s problems with other borrowers.

Making it routine

  1. Keep a list of contractors by loan.
  2. Search it before each new loan.
  3. Search it when a contractor slips.
  4. Keep to facts and do not share them with other borrowers.

Run your own numbers

Use the free fix-and-flip loan sizer below to see the combined exposure of loans with one contractor.

Quick answers

What is the cross-check?

Searching your loan files to see if a contractor works on other loans.

How do I price it?

The minutes times the value of your time.

What does shared trouble cost?

Delays and losses on more than one loan at once.

What is the break-even chance?

The check's cost divided by the cost of shared trouble.

Do the numbers in this guide apply to my loans?

No. The time, cost and odds are made up for the example. They are not predictions.