Lender Watch List: Early Warning Signs on a Loan

By DeskTech HQ · · 2 min read

Most loan problems show up as small signs first: a payment a few days late, a project that has stalled, an insurance policy that lapsed. A watch list collects those signs in one place so the loans that need attention are not found by accident.

The steps

  1. Write down the warning signs and give each a point value.
  2. Each month, check every loan against the list and add up its points.
  3. Sort loans into tiers by score and set an action for each tier.
  4. Record who will do what, and by when.

A worked example

Example (illustrative arithmetic, not a standard)

Points: payment more than 5 days late 2, draw behind schedule 2, insurance lapsed 3, maturity within 60 days 1, contractor changed 1. Tiers: 0–1 Normal, 2–3 Watch, 4 or more Action. Every figure is a made-up round number.

Loan Balance Signs Points Tier
L1 $150,000 None 0 Normal
L2 $100,000 Late payment 2 Watch
L3 $80,000 Maturity soon, new contractor 2 Watch
L4 $200,000 Late payment, draw behind, maturity soon 5 Action
L5 $60,000 Insurance lapsed 3 Watch
L6 $90,000 Draw behind 2 Watch

The book is $680,000. Normal holds $150,000 (22.1%), Watch holds $330,000 (48.5%) and Action holds $200,000 (29.4%). L4 is the biggest loan and has the highest score, so it goes first. Contact the borrower, inspect the property and decide whether a plan is needed (late payments, draws).

What each tier might trigger

  1. Normal: routine monthly review (ledger reconciliation).
  2. Watch: a call to the borrower and a note in the file, and a check on insurance and taxes (insurance).
  3. Action: a site visit, a written plan, and a decision on any extension request (extensions).
  4. Test the loan’s coverage if the value falls (downside test).

Run your own numbers

Use the free fix-and-flip loan sizer below to review how much a loan is tied to the value and cost of the property.

Quick answers

What is a loan watch list?

It is a short, regularly updated list of loans showing signs of trouble. It tells the lender where to spend time first, before a problem becomes a default.

Which warning signs should be on it?

Common ones are late payments, a project behind schedule, a lapsed insurance policy, unpaid property taxes, a maturity date coming up, and a change in contractor. Each lender should write down its own list.

Why use points instead of judgment?

Points make the process consistent and easy to repeat. Judgment still matters: a lender can move a loan up or down a tier and write down why.

How often should the list be updated?

Many lenders review it monthly, along with the loan ledger, and sooner when something happens, such as a missed payment.

Do the numbers in this guide apply to my loans?

No. The loans, flags and point values are made up for the example. They are not a standard, market data or a prediction of results.

Keep reading

Private and hard money lending

Mid-Loan Value Check: When a BPO Pays for Itself

Learn how to price a mid-loan value check against the loss an early warning can prevent, and which triggers justify ordering one on a private money loan.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.