Deal Sourcing Funnel: From Leads to Closings by the Numbers

By DeskTech HQ · · 2 min read

Most leads never become deals, and that is fine. What matters is how many it takes to get one, what that costs, and which step loses the most. A funnel count answers all three with simple division.

The steps

  1. Count the deals at each step over a period, such as a year.
  2. Step rate = deals at this step ÷ deals at the previous step.
  3. Overall rate = closings ÷ leads.
  4. Leads per closing = leads ÷ closings.
  5. Cost per closing = marketing spend ÷ closings.

A worked example

Example (illustrative arithmetic, not a benchmark)

One year, $6,000 of marketing spend. Every figure is a made-up round number.

Step Count Step rate
Leads received 120
Leads analyzed 30 25.0%
Offers made 8 26.7%
Offers accepted 3 37.5%
Deals closed 2 66.7%

The overall rate is 2 ÷ 120 = 1.67%, so it takes 60 leads per closing. Cost per lead is $6,000 ÷ 120 = $50, and cost per closing is $6,000 ÷ 2 = $3,000.

Working backward from a goal. To reach five closings at the same rates (setting a flip goal), the business needs 5 × 60 = 300 leads and about $15,000 of marketing, if cost per lead stays at $50.

Finding the weak step. Only 37.5% of offers are accepted. If better-priced offers raised that to 4 of 8 (50%), closings would be 4 × 66.7% = 2.67, so leads per closing would fall to 45 and cost per closing to $2,250. Better offers, however, mean a thinner margin on each deal (maximum allowable offer), so check profit before chasing the rate.

Using the funnel

  1. Keep the analysis step strict and consistent (comps).
  2. Record the reason for every lost deal.
  3. Never trade a profit minimum for a higher closing rate (sensitivity table).
  4. Review the funnel each quarter.

Run your own numbers

Use the free maximum allowable offer calculator below to test an offer against your profit minimum before you make it.

Quick answers

What is a deal funnel?

It is a count of how many leads reach each step, from first contact to closing. Dividing each step by the one before shows where deals drop out.

Which steps should I track?

Leads received, leads analyzed, offers made, offers accepted and deals closed. Add steps if your process has more, such as walkthroughs.

How do I use the numbers?

Work backward from your goal: closings wanted divided by the overall rate gives the leads needed. Dividing marketing spend by closings gives the cost of each closing.

Is a low conversion rate bad?

Not by itself. A strict analysis step may reject most leads on purpose. What matters is whether the closings you get meet your profit minimum.

Do the numbers in this guide apply to my business?

No. The leads, rates and costs are made up for the example. They are not market data, benchmarks or a prediction of results.

Keep reading

Deal analysis

Ask About a Solar Lease Before an Offer: The Odds

Learn how to price a ten-minute check for a solar panel lease or financing lien on a roof before you offer and find the chance it exists that makes it pay.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.