Draw Fees: Charge Per Draw or Build It Into Points?

By DeskTech HQ · · 2 min read

A loan with two draws and a loan with six draws can carry the same points, but the second one takes three times the inspections, reviews and wires. The question is whether to charge for the work draw by draw or fold it into the price up front.

The steps

  1. Total what one draw costs you: inspection, review time and the wire (inspection cost vs overpayment saved).
  2. Count the draws on a typical loan, and the range.
  3. Price a per-draw fee and, as the alternative, an added point on the loan amount.
  4. Compare each with your cost across a low, typical and high number of draws.
  5. Pick one, and write it clearly in your fee schedule (a clear fee schedule).

A worked example

Example (illustrative arithmetic, not benchmarks)

A $150,000 loan. Each draw costs you $225: a $150 inspection, $50 of review time and a $25 wire. Option A is a $250 fee per draw. Option B is an extra 0.25 point on the loan, $150,000 × 0.25% = $375 once. Every figure is a made-up round number.

Draws Your cost ($225 each) Option A: $250 per draw A minus cost Option B: $375 once B minus cost
2 $450 $500 +$50 $375 −$75
4 $900 $1,000 +$100 $375 −$525
6 $1,350 $1,500 +$150 $375 −$975

The extra point covers your cost only up to $375 ÷ $225 = 1.7 draws. Past that, every additional draw is work you do for nothing. The per-draw fee tracks your cost, at the price of a second line for the borrower to read and possibly push back on.

For the borrower, the picture is reversed: the point costs $375 however the project goes, while per-draw fees add up to $500 on two draws and $1,500 on six. The fee is cheaper for the borrower only on a one-draw job ($250 against $375). Test which structure your own borrowers accept (effective yield with points and fees).

A middle path is a small point plus a limited number of included draws, with a fee only for draws beyond that number.

Making it routine

  1. Track what each draw really costs you for a year.
  2. Track the number of draws per loan.
  3. Choose the structure from those two numbers.
  4. Show it the same way on every term sheet and re-check yearly.

Run your own numbers

Use the free fix-and-flip loan sizer below to see how the holdback and the number of draws shape a loan.

Quick answers

What is a draw fee?

A flat charge the lender collects each time it funds a draw, meant to cover the inspection, review and wire for that draw.

Why not just charge more points?

Points are paid once whether the loan has two draws or eight. A per-draw fee follows the work you actually do, but is a second line the borrower sees and may resist.

Which is better for the lender?

It depends on how many draws your loans usually have and how much each draw costs you. Count both and compare.

Are there rules on fees?

Fees can be limited or have to be disclosed in some places and for some loans. Put them in the documents and talk to a qualified attorney.

Do the numbers in this guide apply to my loans?

No. The loan size, costs and fees are made up for the example. They are not benchmarks.

See DeskTech Lending →

Keep reading

Draw management

A Better Draw Request Form: Payback on Time Saved

Learn how to price the time a clearer draw request form saves by cutting returned and incomplete requests, and how many months it takes to pay for itself.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.