Lender Effective Yield: Points, Interest and Payoff Timing

By DeskTech HQ · · 2 min read

A loan that pays 11% interest does not earn 11%. Points add to the return, and how long the loan lasts changes it. Putting interest and fees into one yield makes loans comparable and shows what an early payoff does.

The formula

  1. Interest earned = loan × rate × months ÷ 12.
  2. Points earned = loan × points percentage.
  3. Total earned = interest + points.
  4. Return on the loan = total earned ÷ loan.
  5. Effective yield = return on the loan × 12 ÷ months.

A worked example

Example (illustrative arithmetic, not market data)

A $150,000 interest-only loan at 11% with 2 points ($3,000) and a 9-month term. Every figure is a made-up round number. The only thing that changes is when the borrower pays off (interest-only payments).

Payoff month Interest Points Total earned Return on loan Effective yield
4 $5,500 $3,000 $8,500 5.67% 17.00%
7 $9,625 $3,000 $12,625 8.42% 14.43%
9 $12,375 $3,000 $15,375 10.25% 13.67%

The same loan yields 17.00% when paid at month 4 and 13.67% at month 9, yet earns $6,875 fewer dollars. Interest was computed on a 12-month year; other methods give slightly different numbers (day-count methods).

Reading the result

  1. A fast payoff raises the yield but leaves idle cash until it is lent again. Compare the yield after counting that gap.
  2. Longer loans move the yield toward the note rate.
  3. Late fees and extension fees are extra and uncertain (late fees, extensions).
  4. Look at yield together with risk and concentration (concentration risk).
  5. Review it across the whole book at year end (loan book review).

Run your own numbers

Use the free fix-and-flip loan sizer below to see how the loan amount relates to value and cost before you work out the yield.

Quick answers

What is effective yield?

It is the total interest and fees a loan earns, divided by the amount lent, then scaled to a full year. It puts loans with different rates, points and lengths on the same footing.

Why does an early payoff raise the yield?

Points are usually charged once, up front. If the loan lasts fewer months, the same fee is spread over less time, so the annualized figure goes up even though total dollars earned go down.

Is a higher yield always better?

Not necessarily. An early payoff means money comes back sooner and has to be lent again. Yield also says nothing about risk, which depends on the loan-to-value, the borrower and the project.

Should late fees and extension fees be included?

Count them separately and only when actually collected. Mixing expected fees into the yield makes the number look better than the results.

Do the numbers in this guide apply to my loans?

No. The loan size, rate and points are made up for the example. They are not market data, an offer or a prediction of results.

Keep reading

Private and hard money lending

A Standard Loan Package: The Loan Count Where It Pays

Learn how to compare the one-time cost of a standard loan document package with the per-loan cost of custom documents, and the loan count where it pays.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.