Lender Fee Schedule: Keep Loan Fees Clear and Consistent
A borrower who finds a fee they were not told about stops trusting the lender. A one-page fee schedule prevents that. It lists every fee, when it is charged and who gets the money.
What goes on the schedule
- Lender fees: points, document preparation, draw fees, extension fees (late fees).
- Pass-through costs: title and settlement, inspections, recording.
- When each is charged: at closing, with each draw, or only on an event.
- How each is calculated: a flat amount or a percentage of what.
- The total cost to the borrower if the loan runs as planned.
A worked example
Example (illustrative arithmetic, not a recommended price)
A $150,000 loan with four draws and one extension. Every figure is a made-up round number (term sheet).
| Item | Basis | Amount | Who receives it |
|---|---|---|---|
| Points | 2% of $150,000 | $3,000 | Lender |
| Document preparation | Flat | $750 | Lender |
| Draw fees | 4 × $150 | $600 | Lender |
| Extension fee | 0.5% of $150,000 | $750 | Lender |
| Lender fees | $5,100 (3.40% of the loan) | ||
| Title and settlement | Flat | $1,800 | Third party |
| Draw inspections | 4 × $175 | $700 | Third party |
| Recording | Flat | $250 | Government office |
| Pass-through costs | $2,750 | ||
| Total to the borrower | $7,850 (5.23% of the loan) |
Only $5,100 is lender income. Counting the pass-through costs as lender income would overstate the yield (effective yield). Interest is extra and is not in the table.
Keeping it consistent
- Put the schedule in the term sheet and the loan documents (loan file checklist).
- Charge only what the schedule lists, and record any waiver and the reason (servicing).
- Check the schedule against your state’s rules, which a professional can review.
- Review it once a year (year-end loan book review).
Run your own numbers
Use the free fix-and-flip loan sizer below to size a loan before you add fees to the picture.