Extension Fee: Flat or Percent? Where the Balance Crosses
When a loan needs more time, the lender can charge an extension fee. It can be a flat dollar amount or a percent of the balance. The two charge the same at one balance, and differently on either side.
The steps
- Take the flat fee and the percent.
- Crossing balance = flat fee ÷ percent.
- Compare with the balances of your own loans (loan extensions).
A worked example
Example (illustrative arithmetic, not recommended pricing)
The flat fee is $500. The percent fee is 1% of the balance. Every figure is a made-up round number.
| Loan balance | 1% fee | Flat fee | Higher fee |
|---|---|---|---|
| $30,000 | $300 | $500 | Flat |
| $50,000 | $500 | $500 | Equal |
| $150,000 | $1,500 | $500 | Percent |
They cross at $50,000: $500 ÷ 0.01. For a book of loans mostly above that, a percent fee earns much more. For small loans, a flat fee earns more.
An extension fee compensates the lender for added risk and time. The fee should be disclosed in advance, in the loan documents, and consistent across borrowers. A fee that looks like a penalty may be treated as interest and counted against rate limits (default interest after maturity).
Making it routine
- Look at the size spread of your loans.
- State the extension fee in the loan documents.
- Check with an attorney how fees are treated in your state.
- Apply the same fee to every borrower.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how an extension fee changes what a loan earns.