Default Interest After Maturity: Pricing the Cost of Delay

By DeskTech HQ · · 2 min read

A loan matures and the borrower does not pay. The note keeps charging the contract rate, which is the same rate the borrower was paying when everything was on schedule. A default rate changes the incentive: waiting now costs more than asking.

The steps

  1. Contract-rate interest = loan × rate × months ÷ 12.
  2. Default-rate interest = loan × default rate × months ÷ 12.
  3. Extra cost of delay = default-rate interest − contract-rate interest.
  4. Compare with an extension: contract-rate interest + the extension fee (extensions).

A worked example

A $150,000 loan at 11%, a default rate of 16% after maturity (5 points higher), and an extension fee of 1% ($1,500). Every figure is a made-up round number (term sheet).

Months past maturity Contract-rate interest Default-rate interest Extra cost of delay
1 $1,375 $2,000 $625
3 $4,125 $6,000 $1,875
6 $8,250 $12,000 $3,750

The extra cost is $625 a month, about $20.55 a day. Extension against default rate for the borrower:

Months needed Extension (interest + $1,500 fee) Default rate Cheaper for the borrower
1 $2,875 $2,000 Default rate
2 $4,250 $4,000 Default rate
3 $5,625 $6,000 Extension
6 $9,750 $12,000 Extension

The two cost the same at 2.4 months ($1,500 ÷ $625). For a short delay the default rate is cheaper for the borrower, so it is not a deterrent for a payoff that is two weeks away. It is a deterrent for a loan that will take months. A lender who wants borrowers to ask early prices the extension accordingly (late fees).

Using the clause

  1. State when the default rate starts, how it is calculated and whether it applies to the whole balance.
  2. Show it on the term sheet and the fee schedule (fee schedule).
  3. Record each time you waive it, and why (payoff discounts).
  4. Have the clause checked against your state’s limits before use.

Run your own numbers

Use the free fix-and-flip loan sizer below to size a loan before you set its terms.

Quick answers

What is default interest?

It is a higher interest rate that applies if a borrower does not repay at maturity or defaults in another way. The rate and when it starts are set in the note.

Why have it?

It compensates the lender for the added risk and cost of a late loan, and it gives the borrower a reason to sort out a payoff or ask for an extension early. It does not replace a workout.

Are there limits on default interest?

Often, yes. State law and the type of loan can limit the rate, how it is calculated and how it must be disclosed, and some courts examine penalty-like charges. A lawyer should review the clause.

How does it compare with an extension fee?

An extension fee is a one-time charge for more time at the normal rate. Default interest is a higher rate for each month the loan stays unpaid. Which costs the borrower more depends on how many months are needed.

Do the numbers in this guide apply to my loans?

No. The loan, rates and fee are made up for the example. They are not recommended terms or legal advice.

Keep reading

Private and hard money lending

Loan Workout Options: Extend, Modify or Enforce

Learn how a private lender can compare extending a past-maturity loan with enforcing it, using the amount owed, the time and the value, with an example.

· 2 min read
Private and hard money lending

A Standard Loan Package: The Loan Count Where It Pays

Learn how to compare the one-time cost of a standard loan document package with the per-loan cost of custom documents, and the loan count where it pays.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.