Find Where the Lot Drains to Before an Offer: The Odds
The back yard slopes toward the house and there is no drain at the low corner. The first big rain turns the basement into a pond. A five-minute look at where the lot drains to takes a walk around the edge. The question is how likely a drainage surprise is for the look to pay before you offer.
The steps
- Price the look: minutes × the value of your time.
- Price a drainage surprise: grading, drains or a wet basement fix.
- Break-even chance = look cost ÷ surprise cost.
- Walk the soggy spots too (walk the yard for soggy spots).
A worked example
Example (illustrative arithmetic, not predictions)
The look takes 5 minutes at $60 an hour: $5. A drainage surprise costs $1,000 to fix. Every figure is a made-up round number.
| Chance of a drainage surprise | Expected cost avoided (chance × $1,000) | Avoided − $5 |
|---|---|---|
| 0.25% | $2.50 | −$2.50 |
| 0.5% | $5 | $0 (break-even) |
| 1.5% | $15 | +$10 |
| 3% | $30 | +$25 |
The look pays at a 0.5% chance of a drainage surprise: $5 ÷ $1,000. On a sloping or flat lot, it is easily exceeded.
Walk the edge of the lot, find the low point, note where water would go and look for a drain, ditch or swale there. Ask the city about street flooding, and have a professional assess serious problems.
Making it routine
- Walk the edge of the lot.
- Find the low point.
- Look for a drain, ditch or swale there.
- Ask the city about street flooding.
Run your own numbers
Use the free MAO calculator below to see how a drainage fix changes the most you can offer.