A Fire Extinguisher in the Kitchen at Turnover: The Odds

By DeskTech HQ · · 1 min read

A grease fire in a pan is small for the first minute. An extinguisher on the wall can keep it small. A kitchen-rated extinguisher costs about twenty-five dollars. The question is how likely a small fire is, in a year, for the extinguisher to pay.

The steps

  1. Price the extinguisher: the unit plus minutes to mount and log it.
  2. Estimate the damage a stopped small fire would avoid.
  3. Break-even chance per year = cost ÷ damage avoided.
  4. Pair it with alarms (sealed ten-year smoke alarms or 9-volt).

A worked example

Example (illustrative arithmetic, not quotes or predictions)

The extinguisher and its mounting cost $30. A small fire stopped early would avoid $3,000 of damage. Every figure is a made-up round number.

Yearly chance of a small kitchen fire the extinguisher stops Expected damage avoided (chance × $3,000) Avoided − $30
0.5% $15 −$15
1% $30 $0 (break-even)
3% $90 +$60
6% $180 +$150

The extinguisher pays at a 1% yearly chance of a stoppable fire: $30 ÷ $3,000. Over a multi-year tenancy and many units, that is plausible.

Choose a unit rated for kitchen fires, mount it where a tenant can reach it without crossing the stove, and write the date on a tag. Check the pressure gauge at each turnover and replace expired units. Tell tenants that the first step in any fire is to get out and call for help.

Making it routine

  1. Mount a kitchen-rated extinguisher by the exit.
  2. Tag it with the date.
  3. Check the gauge at each turnover.
  4. Check local fire rules.

Run your own numbers

Use the free BRRRR calculator below to see how a fire loss changes a rental’s cash flow.

Quick answers

Why put one in the kitchen?

Most small home fires start in the kitchen, and an extinguisher can stop one early.

How do I price it?

The extinguisher plus the minutes to mount and log it.

What is the break-even chance?

The cost divided by the damage a stopped fire would avoid.

Is it required?

Some places require one in rentals. Check your local rules.

Do the numbers in this guide apply to my rental?

No. The cost, damage and odds are made up for the example. They are not quotes or predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.