Fit a Dusk-to-Dawn Porch Light at Turnover: The Odds
A tenant calls because the entry is dark: the bulb is out, or the switch is inside and nobody remembers it. A sensor fixture costs about twenty-five dollars and fifteen minutes. The question is how likely a dark-entry call is for the fixture to pay.
The steps
- Price the fixture: cost + minutes × the value of your time.
- Price a dark-entry call: a visit to replace a bulb or fix a switch.
- Break-even chance = setup cost ÷ call cost.
- Check the panel too (label the breaker panel at turnover).
A worked example
Example (illustrative arithmetic, not predictions)
The fixture costs $25 plus 15 minutes at $60 an hour ($15): $40. A dark-entry call costs $200 to handle. Every figure is a made-up round number.
| Chance of a dark-entry call | Expected cost avoided (chance × $200) | Avoided − $40 |
|---|---|---|
| 10% | $20 | −$20 |
| 20% | $40 | $0 (break-even) |
| 30% | $60 | +$20 |
| 50% | $100 | +$60 |
The fixture pays at a 20% chance of a dark-entry call: $40 ÷ $200. Over a long hold, that is likely.
Use a fixture rated for the location, turn the power off at the breaker before you start, and use a licensed electrician where the work requires one. A light is not a security system.
Making it routine
- Choose a fixture rated for the location.
- Turn off the breaker before starting.
- Use a licensed electrician where required.
- Test after dark.
Run your own numbers
Use the free closing net sheet below to see how small turnover costs add up against what you keep at sale.