Replace Clogged Shower Heads at Turnover: The Odds
A tenant moves in and the shower dribbles out of half its holes. The call is the first of the lease. A new head costs about fifteen dollars and five minutes to fit. The question is how likely a low-pressure call is for the swap to pay.
The steps
- Price the swap: head + minutes × the value of your time.
- Price a low-pressure call: a visit to find the cause.
- Break-even chance = swap cost ÷ call cost.
- Clean the aerators too (clean or replace faucet aerators at turnover).
A worked example
Example (illustrative arithmetic, not predictions)
The head costs $15 plus 5 minutes at $60 an hour ($5): $20. A low-pressure call costs $80. Every figure is a made-up round number.
| Chance of a low-pressure call | Expected cost avoided (chance × $80) | Avoided − $20 |
|---|---|---|
| 12.5% | $10 | −$10 |
| 25% | $20 | $0 (break-even) |
| 40% | $32 | +$12 |
| 60% | $48 | +$28 |
The swap pays at a 25% chance of a low-pressure call: $20 ÷ $80. With hard water and an old head, it is plausible.
Unscrew the old head, wrap the thread with fresh tape, hand-tighten the new head and test the spray. If pressure is still low, look at the valve and the water heater.
Making it routine
- Unscrew the old head.
- Wrap the thread with fresh tape.
- Hand-tighten the new head and test.
- Look at the valve and heater if pressure stays low.
Run your own numbers
Use the free closing net sheet below to see how small turnover costs add up against what you keep at sale.