Add Downspout Extensions at Turnover: The Wet-Basement Odds

By DeskTech HQ · · 1 min read

A downspout empties beside the foundation. After a storm, water finds its way into the basement and the tenant calls. An extension costs about ten dollars and ten minutes. The question is how likely a wet-basement call is for it to pay.

The steps

  1. Price the extensions: parts + minutes × the value of your time.
  2. Price a wet-basement call: a visit, cleanup and possible repair.
  3. Break-even chance = setup cost ÷ call cost.
  4. Check the gutters too (trim branches away from the roof and gutters).

A worked example

Example (illustrative arithmetic, not predictions)

The extensions cost $10 plus 10 minutes at $60 an hour ($10): $20. A wet-basement call costs $400 to handle. Every figure is a made-up round number.

Chance of a wet-basement call Expected cost avoided (chance × $400) Avoided − $20
2.5% $10 −$10
5% $20 $0 (break-even)
10% $40 +$20
15% $60 +$40

The extensions pay at a 5% chance of a wet-basement call: $20 ÷ $400. On a house with a basement and a downspout at the wall, that is plausible.

Point the water several feet from the foundation, over ground that slopes away, and keep it off neighboring land and walkways. If water still gets in, look at the grading and the foundation with a qualified professional.

Making it routine

  1. Check where each downspout empties.
  2. Extend it several feet from the wall.
  3. Make sure the ground slopes away.
  4. Keep water off neighbors and walkways.

Run your own numbers

Use the free closing net sheet below to see how small turnover costs add up against what you keep at sale.

Quick answers

What does an extension do?

It carries roof water away from the foundation.

How do I price it?

The parts plus the minutes to fit them.

What does a wet-basement call cost?

A visit, cleanup and possibly a repair.

What is the break-even chance?

The setup cost divided by the call cost.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Rehab budgeting

Add a Final Cleaning Line to the Rehab Budget

Learn how to price adding a final cleaning line to the rehab budget and find the forgotten-clean chance at which three minutes of work pays for itself.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.