Credit Line Size: What the Unused Part Costs You

By DeskTech HQ · · 2 min read

A lender that borrows to fund loans pays a fee on the part of the line it does not use. A $1,000,000 line that averages $600,000 drawn leaves $400,000 idle. The question is whether a smaller line would save more than it costs.

The steps

  1. Find the line’s size, the fee rate on the unused part and your average drawn amount.
  2. Compute the unused fee: (line − average drawn) × fee rate.
  3. Find your peak need: the most you borrowed at one time in the past year.
  4. Compute the fee at a smaller line.
  5. Compare the saving with the income on loans you might miss if the line were smaller than your peak (unfunded commitments).

A worked example

Example (illustrative arithmetic, not quotes)

A $1,000,000 line, $600,000 drawn on average, and a 0.5% fee on the unused part. Fee: $400,000 × 0.5% = $2,000 a year. A $800,000 line would leave $200,000 unused: $200,000 × 0.5% = $1,000. Saving: $1,000. A loan nets $5,000. Every figure is a made-up round number.

Missed loans a year because the smaller line is too small Income lost (× $5,000) Fee saved Net of the smaller line
0 $0 $1,000 +$1,000
0.2 $1,000 $1,000 $0
1 $5,000 $1,000 −$4,000
Break-even $1,000 ÷ $5,000 = 0.2 loans a year

The smaller line saves $1,000 only if it never makes you miss a loan. A single missed loan a year costs five times the fee saving. So size the line to your peak need, not your average. If your peak draw in the last year was $850,000, an $800,000 line would have failed you at the busiest moment, and the saving would be worth little.

Unused fees are a price for being able to say yes to a good loan the week it arrives. They are worth paying up to the point where the line exceeds your realistic peak by more than you need as a cushion. And a smaller line is not the only way to cut the fee: some lines can be negotiated, or have a step-down that follows your average use (leverage and the lender’s spread).

Making it routine

  1. Track your borrowed balance every month.
  2. Find the peak each year.
  3. Size the line to the peak plus a cushion.
  4. Re-read the credit agreement before any change.

Run your own numbers

Use the free fix-and-flip loan sizer below to see the funding each loan needs, and so how your peak builds up.

Quick answers

What is an unused fee?

A fee some credit lines charge on the part of the line you are not using, as a percentage of that unused amount.

Why not just take a smaller line?

A smaller line saves the fee but may leave you short at your busiest time, when you would have to turn a loan down.

How do I decide?

Compare the fee you would save with the income on the loans a smaller line might make you miss.

What is peak need?

The most you borrow at any one time. A line smaller than that will sometimes fail you.

Do the numbers in this guide apply to my line?

No. The line size, fee and income are made up for the example. They are not quotes.

Keep reading

Private and hard money lending

A Standard Loan Package: The Loan Count Where It Pays

Learn how to compare the one-time cost of a standard loan document package with the per-loan cost of custom documents, and the loan count where it pays.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.