Flip Every Ceiling Light, Fan and Switch at Turnover
A tenant moves in and the hall light and the bedroom fan do nothing. The first calls of the lease are about switches. Flipping every one at turnover takes ten minutes. The question is how likely a dead-fixture callout is for the test to pay.
The steps
- Price the test: minutes × the value of your time.
- Price a dead-fixture callout: a visit to find the fault.
- Break-even chance = test cost ÷ callout cost.
- Check the bulbs too (leave working light bulbs at move-in).
A worked example
Example (illustrative arithmetic, not predictions)
The test takes 10 minutes at $60 an hour: $10. A dead-fixture callout costs $100. Every figure is a made-up round number.
| Chance of a dead-fixture callout | Expected cost avoided (chance × $100) | Avoided − $10 |
|---|---|---|
| 5% | $5 | −$5 |
| 10% | $10 | $0 (break-even) |
| 20% | $20 | +$10 |
| 30% | $30 | +$20 |
The test pays at a 10% chance of a dead-fixture callout: $10 ÷ $100. In a house with many fixtures and old switches, it is plausible.
Flip each switch, note what it controls, fit a known-good bulb where a fixture stays dark and mark anything that fails for an electrician. Do not work on a fixture with the power on.
Making it routine
- Flip each switch and note what it controls.
- Try a known-good bulb in dark fixtures.
- Mark failures for an electrician.
- Never work on a fixture with the power on.
Run your own numbers
Use the free closing net sheet below to see how small turnover costs add up against what you keep at sale.