Flush the AC Condensate Drain Line at Turnover: The Odds
An air conditioner makes water. A small pipe carries it away. When algae clogs the pipe, the pan fills and the water goes through the ceiling. A flush costs a few dollars of supplies and ten minutes. The question is how likely an overflow is for the flush to pay.
The steps
- Price the flush: supplies + minutes × the value of your time.
- Price an overflow: ceiling or floor damage and a service visit.
- Break-even chance = flush cost ÷ overflow cost.
- Pair it with the filter (leave a furnace filter at move-in).
A worked example
Example (illustrative arithmetic, not predictions)
The flush costs $3 of supplies plus 10 minutes at $60 an hour ($10): $13. An overflow costs $650 to repair. Every figure is a made-up round number.
| Chance of an overflow | Expected cost avoided (chance × $650) | Avoided − $13 |
|---|---|---|
| 1% | $6.50 | −$6.50 |
| 2% | $13 | $0 (break-even) |
| 4% | $26 | +$13 |
| 6% | $39 | +$26 |
The flush pays at a 2% chance of an overflow: $13 ÷ $650. On a system with an attic air handler, it is plausible.
Turn off the power to the unit, follow the maker’s instructions for flushing the line, and check that water drains out. If it backs up again, call a qualified HVAC technician.
Making it routine
- Turn off the power to the unit.
- Follow the maker’s flushing steps.
- Check that water drains out.
- Call a technician if it backs up.
Run your own numbers
Use the free closing net sheet below to see how small turnover costs add up against what you keep at sale.