Caulk the Sink Edge and Counter Joints at Turnover

By DeskTech HQ · · 1 min read

Water from the sink edge runs under the laminate and swells the particle board. By the time the counter lifts, the cabinet base is soft. A bead of caulk costs about five dollars and fifteen minutes with the old caulk removed. The question is how likely hidden water damage is for the job to pay.

The steps

  1. Price the job: caulk + minutes × the value of your time.
  2. Price hidden water damage: a swollen counter and cabinet repair.
  3. Break-even chance = job cost ÷ repair cost.
  4. Check the traps too (run water under every sink and check the traps).

A worked example

Example (illustrative arithmetic, not predictions)

The job costs $5 of caulk plus 15 minutes at $60 an hour ($15): $20. Hidden water damage costs $400 to repair. Every figure is a made-up round number.

Chance of hidden water damage Expected cost avoided (chance × $400) Avoided − $20
2.5% $10 −$10
5% $20 $0 (break-even)
10% $40 +$20
15% $60 +$40

The job pays at a 5% chance of hidden water damage: $20 ÷ $400. With an old caulk line, that is plausible.

Scrape out the old caulk, clean and dry the joint, run a bead of kitchen-and-bath caulk and smooth it. Let it cure as the label says. If the base is soft, replace it before sealing.

Making it routine

  1. Scrape out old caulk.
  2. Clean and dry the joint.
  3. Run and smooth a bead.
  4. Let it cure as the label says.

Run your own numbers

Use the free closing net sheet below to see how small turnover costs add up against what you keep at sale.

Quick answers

Which joints get caulked?

Where the sink meets the counter and where the counter meets the wall.

How do I price it?

The caulk plus the minutes to clean and run the bead.

What does hidden water damage cost?

A swollen counter base, a wet cabinet and a repair.

What is the break-even chance?

The job's cost divided by the repair cost.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Rehab budgeting

Add a Final Cleaning Line to the Rehab Budget

Learn how to price adding a final cleaning line to the rehab budget and find the forgotten-clean chance at which three minutes of work pays for itself.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.