Frost-Free Hose Bib or Standard: The Freeze Odds

By DeskTech HQ · · 2 min read

A standard outdoor faucet can freeze and burst inside the wall when a hose is left on in winter. A frost-free faucet puts the valve inside the warm part of the wall. It costs more. The question is how likely a freeze has to be, over the faucet’s life, for the extra cost to pay.

The steps

  1. Find the extra cost: the frost-free faucet minus the standard one.
  2. Estimate the damage a burst would cause: water in the wall, repair, tenant disruption.
  3. Break-even chance over the faucet’s life = extra cost ÷ damage avoided.
  4. Compare with your winters and how tenants use hoses (washer drain pan and shutoff).

A worked example

Example (illustrative arithmetic, not quotes or predictions)

A standard faucet costs $15 and a frost-free one $35, so the extra is $20. A burst would cost $1,000 to repair. Every figure is a made-up round number.

Chance of a freeze burst over the faucet’s life Expected damage avoided (chance × $1,000) Avoided − $20
1% $10 −$10
2% $20 $0 (break-even)
5% $50 +$30
10% $100 +$80

The frost-free faucet pays at a 2% chance of a burst over its life: $20 ÷ $1,000. In a place with hard winters and tenants who leave hoses on, that chance is likely higher. In a mild climate it is lower.

A frost-free faucet still needs a slight slope to drain, and a hose left attached can hold water in it. Tell tenants to remove hoses in autumn (the cost of turnover).

Making it routine

  1. Choose the frost-free faucet when replacing in cold climates.
  2. Add a hose reminder to the autumn tenant notice.
  3. Compute the break-even chance for your winters.
  4. Use a licensed plumber where required.

Run your own numbers

Use the free BRRRR calculator below to see how a burst-pipe repair changes a rental’s yearly cash flow.

Quick answers

What is a frost-free hose bib?

An outdoor faucet whose valve sits inside the heated wall.

How do I compare the two?

Take the extra price and divide it by the cost of a burst pipe.

What is the break-even chance?

The extra price divided by the damage avoided.

Does it matter in warm climates?

Much less. The odds of a freeze are low.

Do the numbers in this guide apply to my rental?

No. The prices, damage and odds are made up for the example. They are not quotes or predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.