Hang a Shower Curtain Rod and Liner Before the Photos

By DeskTech HQ · · 1 min read

The listing photos show a bare tub, a rusty rod and a stained liner. The bath looks like an afterthought. A new rod and liner cost about twenty dollars and five minutes. The question is how likely a prospect is to pass over the bath for the setup to pay.

The steps

  1. Price the setup: rod and liner + minutes × the value of your time.
  2. Price a passed prospect: extra days of vacancy.
  3. Break-even chance = setup cost ÷ cost of the lost days.
  4. Pair it with the toilet seat (new toilet seat at turnover).

A worked example

Example (illustrative arithmetic, not quotes or predictions)

The setup costs $20 plus 5 minutes at $60 an hour ($5): $25. A passed prospect costs 2 extra vacant days at $50 a day: $100. Every figure is a made-up round number.

Chance a prospect passes over the bath Expected cost avoided (chance × $100) Avoided − $25
12.5% $12.50 −$12.50
25% $25 $0 (break-even)
40% $40 +$15
60% $60 +$35

The setup pays at a 25% chance that a prospect passes over the bath: $25 ÷ $100. Where a bath is a deciding room, it is plausible.

Choose a rod that fits the opening and suits the wall, hang a plain light liner and photograph the bath with it in place. Do not overload a tension rod.

Making it routine

  1. Choose a rod that fits the opening.
  2. Hang a plain light liner.
  3. Photograph the bath with it in place.
  4. Do not overload a tension rod.

Run your own numbers

Use the free BRRRR calculator below to see what each vacant day costs on your own rental.

Quick answers

Why hang a rod and liner?

A bare tub reads as unfinished and a rusty rod reads as neglected.

How do I price it?

The rod and liner plus the minutes to hang them.

What does a passed prospect cost?

Extra days of vacancy.

What is the break-even chance?

The setup cost divided by the cost of the lost days.

Do the numbers in this guide apply to my rental?

No. The costs, rents and odds are made up for the example. They are not quotes or predictions.

Keep reading

BRRRR

Re-Caulk the Tub at Turnover: The Leak Odds

Learn how to price re-caulking a rental tub or shower at turnover and find the yearly chance of a water leak that makes the $10 of work pay for itself.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.