Good-Standing Checks on Borrower Entities: Worth $15?
A borrowing LLC that skips its annual filing can be suspended or dissolved without anyone telling the lender. A check costs a few dollars and a few minutes. The question is how rare the problem can be and still justify checking.
The steps
- Find the cost of a status check for the state where the entity is registered, in fees and time.
- Estimate the loss if a lapse goes unnoticed and causes a problem, such as a delayed enforcement.
- Divide the cost by the loss. That is the break-even chance of a lapse that matters.
- Compare it with how often entities lapse in your book.
- Check at origination, at extension and once a year (lending to an LLC).
A worked example
Example (illustrative arithmetic, not quotes or statistics)
A check costs $15 in fees and time. A lapse that goes unnoticed and causes a delay or a dispute would cost about $5,000. Every figure is a made-up round number.
| Chance a lapse causes a problem | Expected loss (× $5,000) | Cost of the check | Net |
|---|---|---|---|
| 0.1% | $5 | $15 | −$10 |
| 0.3% | $15 | $15 | $0 |
| 1% | $50 | $15 | +$35 |
| Break-even | $15 ÷ $5,000 = 0.3% |
If one entity in three hundred lapses in a way that matters, the check pays. For a book of 40 loans, annual checks cost $600 in total. That is small next to a single delayed enforcement, and it also gives you a yearly look at the entity’s name, address and officers.
The point of the check is the action it triggers. If an entity has lapsed, you want to know early, ask for reinstatement and have an attorney advise you on what the lapse means for the loan and the collateral. A lapse found at default is much harder to fix than one found at the next annual check (file audits).
Making it routine
- Check status at origination and every year.
- Save the result in the file.
- Require reinstatement if a lapse is found.
- Ask an attorney what to do.
Run your own numbers
Use the free fix-and-flip loan sizer below to size the loans these checks protect.