Re-Caulk the Tub at Turnover: The Leak Odds

By DeskTech HQ · · 1 min read

Cracked caulk around a tub lets water seep behind the wall and under the floor, quietly, for months. Re-caulking costs a tube and fifteen minutes. The question is how likely a leak is, over a year, for the work to pay.

The steps

  1. Price the job: caulk plus minutes of work.
  2. Estimate the damage a seep would cause: rot, mold, a floor repair.
  3. Break-even chance = job cost ÷ damage avoided.
  4. Compare with the age of the bathroom and past leak calls (washer drain pan and shutoff).

A worked example

Example (illustrative arithmetic, not quotes or predictions)

The job costs $10 in caulk and time. A seep left alone would cause $500 of damage. Every figure is a made-up round number.

Chance of a seep without the work Expected damage avoided (chance × $500) Avoided − $10
1% $5 −$5
2% $10 $0 (break-even)
5% $25 +$15
10% $50 +$40

The work pays at a 2% yearly chance of a seep: $10 ÷ $500. A bathroom with old, yellowed or peeling caulk is well above that.

Scrape the old caulk fully and let the surface dry before applying new. If the wall or floor feels soft, stop and have it checked, because caulk will not fix damage already done (the cost of turnover).

Making it routine

  1. Check bathroom caulk at every turnover.
  2. Scrape, dry and redo when it fails.
  3. Feel for soft spots around the tub.
  4. Log the date and what you found.

Run your own numbers

Use the free BRRRR calculator below to see how a water repair changes a rental’s yearly cash flow.

Quick answers

Why re-caulk at turnover?

Failed caulk lets water behind the tub and into the floor.

How do I price it?

The caulk plus the minutes of work.

What is the break-even chance?

The cost divided by the damage a leak would cause.

How often should it be redone?

Check at every turnover and redo when it cracks or peels.

Do the numbers in this guide apply to my rental?

No. The cost, damage and odds are made up for the example. They are not quotes or predictions.