Match the Address on Draw Photos: The Wrong-Property Odds
A contractor working on several houses sends photos of the wrong one. Without a check, a draw is approved for work on another job. Looking for a house number, a front door or a street feature takes two minutes. The question is how likely a mix-up is for the check to pay.
The steps
- Price the check: minutes × the value of your time.
- Estimate the cost of paying for work on the wrong property.
- Break-even chance = cost ÷ loss.
- Pair it with the photo date check (check photo dates on draw requests).
A worked example
Example (illustrative arithmetic, not predictions)
The check takes 2 minutes at $60 an hour: $2. Paying for work on the wrong property would cost $2,000. Every figure is a made-up round number.
| Chance photos show the wrong property | Expected cost avoided (chance × $2,000) | Avoided − $2 |
|---|---|---|
| 0.05% | $1 | −$1 |
| 0.1% | $2 | $0 (break-even) |
| 0.5% | $10 | +$8 |
| 1% | $20 | +$18 |
The check pays at a 0.1% chance of a mix-up: $2 ÷ $2,000. Contractors with several jobs make this mistake more often than that.
Ask for one photo of the front of the house with the number in each request, and compare each set with the baseline and earlier photos. A mismatch is a reason to ask for the right photos, not to assume bad faith (baseline photos at closing).
Making it routine
- Ask for a photo of the front with the house number.
- Compare each set with the baseline photos.
- Ask for correct photos if they do not match.
- Do not assume bad faith.