How to Write a Rehab Scope of Work Contractors Can Bid
Most rehab budget problems start before the first nail: the contractor and the investor were not pricing the same job. A written scope of work fixes that. It tells every bidder what is included, what is not, and what finished looks like, so the bids you get back can actually be compared.
What a scope of work is
A scope of work is a list of the work to be done, usually room by room and trade by trade. It is not a contract by itself, but it becomes the core of one. The more specific it is, the fewer assumptions each contractor has to make.
What to include
- Property basics. Address, size and a short description of the condition.
- Work by area. Kitchen, bathrooms, floors, paint, roof, mechanical systems, exterior and so on.
- Materials and finishes. The type or grade you expect, such as cabinet quality, flooring type or fixture level, instead of “new kitchen.”
- What is excluded. Anything you will buy or handle yourself, and anything not part of this job.
- Permits, cleanup and disposal. Who pulls permits and who hauls away debris.
- Schedule. A start date, a finish date and key milestones.
- Payment terms. How and when the contractor is paid (how draws work).
Write it room by room
Instead of “renovate kitchen,” break the work into pieces a contractor can price: remove old cabinets and countertops, install new cabinets of a stated grade, install a counter of a stated material, install a sink and faucet, repair walls, paint. Do the same for each area. When you walk the property, take photos and note measurements so the scope matches what is really there (budgeting the rehab).
Compare bids on the same scope
Example (illustrative arithmetic, not market data)
Assume three contractors bid the same written scope. Every figure is a made-up round number.
| Item | Bid A | Bid B | Bid C |
|---|---|---|---|
| Total price | $42,000 | $36,000 | $39,000 |
| Includes permits and cleanup | Yes | No | Yes |
| Stated start and finish | 6 weeks | 8 weeks | 7 weeks |
Bid B looks cheapest, but it leaves out permits and cleanup. If those cost an assumed $2,500 and $1,000, bid B really costs $36,000 + $2,500 + $1,000 = $39,500, which is above bid C at $39,000. The cheapest number on the page was not the cheapest job. A written scope makes that gap visible before you sign.
Plan for changes
Even a good scope meets surprises: rot behind a wall, an outdated panel, a hidden leak. Agree up front how changes are handled. A short written change order, with the added work and price signed before the work happens, keeps surprises from becoming disputes. Keep a contingency line in the budget too, and track actual costs against it as the job runs (a weekly project checklist).
Check the contractor, not just the price
Ask for references and recent work. Confirm any license, insurance and permit requirements in your area. Put the scope, price, schedule and payment terms in a written agreement before work starts, and have the right professional review it if you are unsure.
Use the scope in your numbers
The scope gives you a defensible repair number for your offer. Plug the bid total, with a cushion, into the maximum allowable offer calculator (70% rule and MAO) to see how much room the deal has.