Keyless Locks vs Rekeying at Turnover: The Payback Math

By DeskTech HQ · · 2 min read

Every time a tenant moves out, most landlords rekey or replace the lock. It is a small cost that comes back again and again. A keyless lock changes the code instead. The question is how long it takes to pay for itself.

The steps

  1. Price a rekey at turnover, including a visit if you pay for one.
  2. Price the keyless lock, installed, and any yearly cost such as batteries or a subscription.
  3. Estimate turnovers per year for the unit (tenant turnover cost).
  4. Compute the yearly saving: turnovers times the rekey cost, less the lock’s yearly cost.
  5. Divide the lock’s cost by the yearly saving to get the payback in years.

A worked example

Example (illustrative arithmetic, not quotes or statistics)

A rekey costs $120. A keyless lock costs $220 installed and $20 a year in batteries and upkeep. Every figure is a made-up round number.

Turnovers per year Rekey cost avoided (× $120) Less $20 upkeep Yearly saving Payback
0.25 (one every 4 years) $30 −$20 $10 22 years
0.5 (one every 2 years) $60 −$20 $40 5.5 years
1 $120 −$20 $100 2.2 years

For a long-term rental with a stable tenant, the lock may never pay back in money. For a unit that turns every year, or for short stays, it pays back in a couple of years. The honest answer depends on your turnover rate, which is why you should use your own record (your own seasonal and turnover records).

The arithmetic leaves out lost keys, tenants who want a physical key, and the risk of lock failure or a dead battery. It also leaves out rules on access and notice, which vary by place. Treat payback as one input, and count the lock as a capital item with a life of its own (rental capex reserve).

Making it routine

  1. Record turnovers per unit each year.
  2. Compare the rekey cost with the lock’s payback for each unit.
  3. Choose by unit, not for the whole portfolio.
  4. Confirm local rules before changing how locks work.

Run your own numbers

Use the free BRRRR calculator below to see how a yearly operating cost changes a rental’s cash flow (expenses to count).

Quick answers

Why compare them?

Rekeying is a cost at every turnover. A keyless lock costs more once and less afterward, so there is a point at which it pays for itself.

How do I find the payback?

Divide the extra upfront cost by the yearly saving, which is the turnovers per year times the rekey cost, less any yearly cost of the keyless lock.

What does the arithmetic leave out?

Lost keys, tenant preference, security and the cost of replacing the lock. Those can matter as much as the payback.

Are there rules on changing locks?

Yes. Rules on lock changes, access and tenant notice differ by state and city. Confirm what applies with a qualified professional.

Do the numbers in this guide apply to my rentals?

No. The costs and turnover rates are made up for the example. They are not quotes or statistics.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.