Leave a Plunger and Toilet Brush at Move-In: The Odds
A tenant faces a slow toilet on the first night and has no plunger. The call comes in at 9 p.m. A plunger and a brush in each bathroom cost about twelve dollars. The question is how likely a clog call is, in the first year, for the kit to pay.
The steps
- Price the kit: the items plus the minutes to place them.
- Price a clog call: the call, the trip and goodwill.
- Break-even chance = kit cost ÷ call cost.
- Compare with your call log (the cost of turnover).
A worked example
Example (illustrative arithmetic, not quotes or predictions)
The kit costs $12 with time. A clog call would cost $120. Every figure is a made-up round number.
| Chance of a clog call in the first year | Expected call cost avoided (chance × $120) | Avoided − $12 |
|---|---|---|
| 5% | $6 | −$6 |
| 10% | $12 | $0 (break-even) |
| 20% | $24 | +$12 |
| 40% | $48 | +$36 |
The kit pays at a 10% chance of a clog call: $12 ÷ $120. With a family in the unit, a first-year clog is common.
Place a plunger and a brush by each toilet, and say in the lease or the move-in sheet that they stay with the unit. If a unit has repeated clogs, have a plumber check the line instead of relying on the plunger.
Making it routine
- Place a plunger and brush in each bathroom.
- List them in the move-in sheet.
- Replace them at turnover if worn.
- Call a plumber for repeated clogs.
Run your own numbers
Use the free BRRRR calculator below to see how small yearly costs per unit add up across a building.