Leave a Spare Box of Tile at Turnover: The Repair Odds

By DeskTech HQ · · 1 min read

A tile cracks two years later. The pattern is discontinued and a patch will not match, so the whole floor has to be redone. A spare box costs about thirty dollars and ten minutes. The question is how likely a later tile repair is for the spare to pay.

The steps

  1. Price the spare: box + minutes × the value of your time.
  2. Price the extra cost of a mismatch: a larger retile.
  3. Break-even chance = spare cost ÷ extra mismatch cost.
  4. Seal the grout too (seal the grout at turnover).

A worked example

Example (illustrative arithmetic, not predictions)

The spare costs $30 plus 10 minutes at $60 an hour ($10): $40. A mismatch adds $400 to a repair. Every figure is a made-up round number.

Chance of a later tile repair Expected cost avoided (chance × $400) Avoided − $40
5% $20 −$20
10% $40 $0 (break-even)
20% $80 +$40
30% $120 +$80

The spare pays at a 10% chance of a later tile repair: $40 ÷ $400. Over a long hold, that is plausible.

Keep a box from the same lot as the installed tile, label it with the brand, color, lot number and room, and store it where it will not be thrown out. Photograph the label for the file.

Making it routine

  1. Buy a spare box from the same lot.
  2. Label brand, color, lot and room.
  3. Store it where it will not be discarded.
  4. Photograph the label.

Run your own numbers

Use the free BRRRR calculator below to see how an avoided larger repair affects a hold.

Quick answers

Why keep spare tile?

Tile is often discontinued or changes shade between lots, so matching later is hard.

How do I price it?

The extra box plus the minutes to label and store it.

What does a mismatch cost?

A larger retile because a patch will not match.

What is the break-even chance?

The spare's cost divided by the extra cost of a mismatch.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.