Concentration Risk: Don't Lend Too Much to One Borrower
A single bad loan hurts. A bad loan that is a third of the book can end a lending business. Measuring concentration is a way to see that risk before it shows up as a loss.
Three kinds of concentration
- Borrower. All the loans to one person or related entities.
- Area. Loans on properties in the same neighborhood, city or market.
- Project type or contractor. The same kind of rehab, or the same contractor on many jobs.
A worked example
Example (illustrative arithmetic, not a standard)
Assume six borrowers with eight loans totalling $900,000. The loans, areas and a 25% single-borrower limit are made up. Amounts are in thousands.
| Borrower | Loans | Total | Share of $900,000 |
|---|---|---|---|
| A | $150 + $120 | $270 | 30.0% |
| B | $140 | $140 | 15.6% |
| C | $130 | $130 | 14.4% |
| D | $160 | $160 | 17.8% |
| E | $90 | $90 | 10.0% |
| F | $110 | $110 | 12.2% |
Borrower A is 30% of the book, above the example 25% limit. The limit in dollars is 25% × $900 = $225, so A is $45 over. The two largest borrowers, A and D, are ($270 + $160) ÷ $900 = about 47.8%.
Now look at area. Suppose A’s $150 loan, C’s loan and F’s loan are all in the same neighborhood.
| Area check | Calculation | Share |
|---|---|---|
| Same-neighborhood loans | $150 + $130 + $110 = $390 | 43.3% of $900 |
More than 40% of the book depends on one neighborhood, even though no single borrower dominates it.
What to do with the result
- Write limits down before the next loan, for borrower, area and project type.
- Check each new request against the limits (a pre-funding checklist).
- If a limit is exceeded, consider a smaller loan, a participation or a pause on new loans to that borrower.
- Recheck as loans pay off and new ones are made (loan ledger reconciliation).
- Tie limits to what you can lose, not only to what you hope to earn (personal guarantees and recourse).
Size the next loan
Use the free loan sizer below to compare a new loan with the property’s value, then check it against your limits.