Pricing by Risk Tier: What Rate Covers the Expected Loss
A lender charges 10% and 2 points on every loan, whether the borrower has done thirty flips or one. The easiest deals subsidize the hardest ones. A risk-tier grid shows how much.
The steps
- Define two or three tiers with written criteria, such as borrower experience and loan-to-value (scorecard).
- For each tier, estimate loss as a share of the amount lent, from your own history (loss reserves).
- Estimate the extra servicing cost per tier as a share of the loan.
- Compute the net yield: gross yield minus loss minus servicing cost (effective yield).
- Decide whether to raise the price on the weaker tiers, narrow the criteria, or decline them.
A worked example
Example (illustrative arithmetic, not market data)
Every loan is 9 months, 10% a year and 2 points, so the gross yield is 2% + 10% × 9/12 = 9.5% of the loan. Loss and servicing figures are made-up round numbers.
| Tier | Gross yield | Expected loss | Servicing cost | Net yield |
|---|---|---|---|---|
| A: experienced, low leverage | 9.5% | 0.2% | 0.5% | 8.8% |
| B: some experience | 9.5% | 0.8% | 0.8% | 7.9% |
| C: first-timer, high leverage | 9.5% | 2.0% | 1.5% | 6.0% |
On a $100,000 loan, tier A nets $8,800 and tier C nets $6,000, a gap of $2,800. Same price, different result. To bring tier B up to tier A’s 8.8%, it must earn 0.9 points more, about 1.2 points of annual rate over nine months (0.9 ÷ 0.75). To bring tier C up, it needs 2.8 points more, about 3.7 points of rate. If the price cannot reach that level, the weaker tier may be better declined or limited to a smaller loan size (minimum loan size).
With a few dozen loans the loss figures are rough. Treat the grid as a starting point and revisit it as results come in (exceptions log).
Making it routine
- Write the tier criteria and the price for each, and apply them the same way every time (fee schedule).
- Record losses and servicing time by tier.
- Review the grid once a year.
- Have an attorney check the grid against your state’s rules.
Run your own numbers
Use the free fix-and-flip loan sizer below to test loan size and leverage for each of your tiers.