Lender Downside Test: What If the Value Falls?
Loan-to-value looks at the day the loan is made. A downside test looks ahead to a bad day: the borrower stops paying, time passes, costs build and the property sells for less than hoped.
The steps
- Amount owed = principal + unpaid interest + legal and carrying costs.
- Net from a sale = sale price × (1 − selling cost percentage).
- Cushion = net from a sale − amount owed.
- Break-even price = amount owed ÷ (1 − selling cost percentage).
- Compare the break-even price with the expected value (LTV, LTC and ARV).
A worked example
Example (illustrative arithmetic, not market data)
A $150,000 loan at 11% on a property expected to be worth $240,000 when finished. Suppose six months of interest go unpaid ($8,250) and legal and carrying costs reach $7,500, so the amount owed is $165,750. Selling costs are 8%. Every figure is a made-up round number (interest).
| Value change | Sale price | Net after 8% | Cushion | Owed as % of price |
|---|---|---|---|---|
| None | $240,000 | $220,800 | $55,050 | 69.1% |
| −10% | $216,000 | $198,720 | $32,970 | 76.7% |
| −20% | $192,000 | $176,640 | $10,890 | 86.3% |
| −30% | $168,000 | $154,560 | −$11,190 | 98.7% |
Break-even price: $165,750 ÷ 0.92 = $180,163, a drop of 24.9% from $240,000. A fall past that point means a loss unless other protection exists, such as a guarantee (guarantees and recourse).
What to do with the result
- Ask whether a 25% fall is plausible for that property and market, and test the value source (valuation methods).
- If the cushion is thin, consider a lower loan, more borrower cash or a better lien position (lien position).
- Add the downside break-even to the loan file (loan file checklist).
- Act early on a slipping loan (late payments).
Run your own numbers
Use the free fix-and-flip loan sizer below to size the loan against value and cost before you test the downside.