Light Cosmetic or Full Rehab: The Price That Evens Profit

By DeskTech HQ · · 1 min read

A tired house can get a light cosmetic refresh or a full rehab. The full one costs more and takes longer, and has to sell for enough more to be worth it. The break-even is the sale price at which the two earn the same.

The steps

  1. Total the cost of each option: purchase, repairs and carrying cost.
  2. Profit of the light option = its sale price − its total cost.
  3. Break-even price for the full option = its total cost + the light option’s profit.
  4. Check whether comparables support a price that high (the price ceiling for your street).

A worked example

Example (illustrative arithmetic, not predictions)

Purchase is $190,000 either way. Carrying costs $2,500 a month.

  • Light: $15,000 repairs, 2 months ($5,000 carrying), sells for $235,000. Profit $25,000.
  • Full: $45,000 repairs, 5 months ($12,500 carrying). Total cost $247,500.
Full-rehab sale price Full-rehab profit Compared with light ($25,000)
$265,000 $17,500 Light better
$272,500 $25,000 Even (break-even)
$285,000 $37,500 Full better

The full rehab must sell for $272,500: $247,500 plus $25,000. That is $37,500 more than the light option’s price, for $30,000 more in repairs and $7,500 more in carrying cost.

The market decides whether it gets there. If the best comparable on the street is $260,000, the full rehab cannot reach it, however good the work. If a few houses nearby sold for $290,000 after full renovations, it can (comparing contractor bids).

Making it routine

  1. Price both scopes with real numbers.
  2. Include the longer carrying time.
  3. Compute the break-even price.
  4. Compare with the best comparable.

Run your own numbers

Use the free holding cost calculator below to see what the longer schedule costs.

Quick answers

What is the break-even sale price?

The price at which the full rehab's profit equals the light rehab's.

What counts in each cost?

Purchase, repairs and carrying cost for the length of the job.

Why is the full rehab slower?

More work, more permits, more inspections.

Does a full rehab always sell for more?

No. The price ceiling for the street limits it.

Do the numbers in this guide apply to my flip?

No. The costs, prices and times are made up for the example. They are not predictions.