Look for Sump Discharge Pipes on the Neighbors' Houses

By DeskTech HQ · · 1 min read

The street has a pump pipe sticking out at the foot of five houses. Yours shows none, and the seller says the basement is dry. A five-minute walk along the sidewalk looking for discharge pipes costs five dollars of your time. The question is how likely a wet-basement surprise is for the look to pay before you offer.

The steps

  1. Price the look: minutes × the value of your time.
  2. Price a wet-basement surprise: pumps, drains and repairs.
  3. Break-even chance = look cost ÷ surprise cost.
  4. Ask the city too (ask the city about street flooding).

A worked example

Example (illustrative arithmetic, not predictions)

The look takes 5 minutes at $60 an hour: $5. A wet-basement surprise costs $2,500. Every figure is a made-up round number.

Chance of a wet-basement surprise Expected cost avoided (chance × $2,500) Avoided − $5
0.1% $2.50 −$2.50
0.2% $5 $0 (break-even)
0.6% $15 +$10
1% $25 +$20

The look pays at a 0.2% chance of a wet-basement surprise: $5 ÷ $2,500. On a street with low ground, it is easily exceeded.

Walk the sidewalk, note discharge pipes and hoses at the foundations of nearby houses and photograph them from public ground. Ask your inspector to check your basement and sump.

Making it routine

  1. Walk the sidewalk.
  2. Note discharge pipes and hoses.
  3. Photograph from public ground.
  4. Ask your inspector to check the basement and sump.

Run your own numbers

Use the free MAO calculator below to see how a basement water fix changes the most you can offer.

Quick answers

What does a discharge pipe show?

That nearby basements get enough water to need pumps.

How do I price the look?

The minutes times the value of your time.

What does a wet-basement surprise cost?

Pumps, drains and repairs you did not budget.

What is the break-even chance?

The look's cost divided by that cost.

Do the numbers in this guide apply to my deal?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Deal analysis

Ask About a Solar Lease Before an Offer: The Odds

Learn how to price a ten-minute check for a solar panel lease or financing lien on a roof before you offer and find the chance it exists that makes it pay.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.