Low-Flow Showerheads: Payback in Months

By DeskTech HQ · · 1 min read

A showerhead is among the cheapest upgrades in a rental. Where the owner pays for water and for the energy that heats it, a low-flow model can save both. The payback is measured in months.

The steps

  1. Get the cost of the showerheads for the unit or building.
  2. Estimate the yearly savings in water and water heating from your bills.
  3. Payback (months) = cost ÷ (yearly savings ÷ 12).
  4. Compare with other quick upgrades (a low-flow toilet).

A worked example

Example (illustrative arithmetic, not measured results)

Three showerheads cost $60 in total. They save $75 a year in water and water heating. Every figure is a made-up round number.

Months in service Savings (months × $6.25) Savings − $60
3 $19 −$41
9.6 $60 $0 (break-even)
24 $150 +$90

Payback comes in under ten months: $60 ÷ $75 × 12. After that, the saving is steady. If the savings are half that, payback is nineteen months, which is still short.

Check the real use. A one-person apartment saves less than a family home. And a tenant who dislikes the new head may swap in an old one, which ends the saving (a smart thermostat).

Making it routine

  1. Check who pays for water and heat in each unit.
  2. Choose a well-reviewed low-flow model.
  3. Compute the payback months.
  4. Replace at turnover, when access is easy.

Run your own numbers

Use the free BRRRR calculator below to see how a lower yearly expense changes a rental’s cash flow.

Quick answers

How do I find the payback?

Divide the cost by the yearly savings in water and water heating.

Where do the savings come from?

Less water used, and less energy to heat it.

Does the tenant pay for water or heat?

If so, the saving goes to them. This guide is for owner-paid utilities.

Will tenants accept them?

Some dislike low-flow heads. Choose a well-reviewed model.

Do the numbers in this guide apply to my rental?

No. The cost and savings are made up for the example. They are not measured results.

Keep reading

BRRRR

Common-Area LED Retrofit: Payback in Months

Learn how to find the payback on swapping common-area bulbs for LEDs in a multi-unit rental where the owner pays the electric bill, in simple arithmetic.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.