Common-Area LED Retrofit: Payback in Months

By DeskTech HQ · · 1 min read

Hallway, stair and exterior lights run for many hours, and the owner pays the bill. Swapping old bulbs for LEDs costs little and saves each day. The payback is often a matter of months.

The steps

  1. Count fixtures and cost the LED bulbs or fixtures.
  2. Savings per fixture = watts saved ÷ 1,000 × hours a day × 365 × rate.
  3. Payback (months) = cost ÷ (yearly savings ÷ 12).
  4. Add the savings in replacement bulbs and labor (utilities billed separately or in the rent).

A worked example

Example (illustrative arithmetic, not measured savings)

There are 20 fixtures. Replacing a 60-watt bulb with a 9-watt LED costs $6 each, $120. The lights run 12 hours a day at $0.15 per kilowatt-hour. Every figure is a made-up round number.

Each fixture saves 51 watts: 0.051 kW × 12 hours × 365 days × $0.15 is about $33.5 a year. Twenty fixtures save about $670 a year, $56 a month.

Months after the retrofit Savings so far (months × $56) Savings − $120
1 $56 −$64
2.1 $120 $0 (break-even)
12 $670 +$550

Payback comes in a little over two months: $120 ÷ $56. This is a fast one because the lights burn all day. A fixture that runs two hours a night would take years.

Check what is already installed. A building with compact fluorescents saves less than one with incandescents. And look for utility rebates, which can cut the cost further (a capex reserve by system age).

Making it routine

  1. Walk the building and count fixtures and hours.
  2. Take the rate from your bill.
  3. Compute the payback months.
  4. Start with the fixtures that burn longest.

Run your own numbers

Use the free BRRRR calculator below to see how a lower yearly expense changes a rental’s cash flow.

Quick answers

How do I find the payback?

Divide the retrofit cost by the yearly electricity saved.

How do I find the savings?

Watts saved, hours on, days a year and your rate per kilowatt-hour.

Who pays common-area power?

Usually the owner. Check your bills.

Do LEDs last longer?

Yes, which also saves on replacement bulbs and labor.

Do the numbers in this guide apply to my building?

No. The wattage, hours and rate are made up for the example. They are not measured savings.

Keep reading

BRRRR

Low-Flow Showerheads: Payback in Months

Learn how to find the payback in months on low-flow showerheads in a rental where the owner pays for water and water heating, using your own bills.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.