Match the Permit Holder to the Contractor on the Contract
The contract is with a licensed company. The permit on the wall names the borrower as owner-builder. Who is responsible for the work, the inspections and the code? A three-minute look at the permit and the contract answers it. The question is how likely a mismatch is for the check to pay.
The steps
- Price the check: minutes × the value of your time.
- Estimate the cost of a mismatch: stalled inspections, unlicensed work, a harder claim.
- Break-even chance = check cost ÷ mismatch cost.
- Pair it with the permit photo (photo of the posted permit at the first draw).
A worked example
Example (illustrative arithmetic, not predictions)
The check takes 3 minutes at $60 an hour: $3. A mismatch could cost $1,500. Every figure is a made-up round number.
| Chance the permit holder does not match the contractor | Expected cost avoided (chance × $1,500) | Avoided − $3 |
|---|---|---|
| 0.1% | $1.50 | −$1.50 |
| 0.2% | $3.00 | $0 (break-even) |
| 1% | $15.00 | +$12.00 |
| 3% | $45.00 | +$42.00 |
The check pays at a 0.2% chance of a mismatch: $3 ÷ $1,500. Where owners pull permits themselves to save fees, it is far higher.
Compare the permit holder, license number and address with the contract and the W-9. If they differ, ask why and check with the building department. A mismatch may be innocent, or may mean the work is being done by someone who cannot legally pull the permit.
Making it routine
- Compare the permit holder with the contract.
- Check the license number and address.
- Ask about any difference.
- Check with the building department.