Contractor Signs for Each Draw Received: The Odds
A contractor says a draw never arrived. The wire shows sent, the contractor says no. A short written confirmation that each draw was received avoids the argument. Asking takes two minutes. The question is how likely a never-got-it dispute is for the step to pay.
The steps
- Price the step: minutes × the value of your time.
- Price a dispute: tracing the payment and possibly paying twice.
- Break-even chance = step cost ÷ dispute cost.
- Keep it with the lien waivers (lien waivers on draws).
A worked example
Example (illustrative arithmetic, not predictions)
The step takes 2 minutes at $60 an hour: $2. A never-got-it dispute would cost $400. Every figure is a made-up round number.
| Chance of a never-got-it dispute without the receipt | Expected cost avoided (chance × $400) | Avoided − $2 |
|---|---|---|
| 0.25% | $1 | −$1 |
| 0.5% | $2 | $0 (break-even) |
| 2% | $8 | +$6 |
| 5% | $20 | +$18 |
The receipt pays at a 0.5% chance of a dispute: $2 ÷ $400. Over many draws and payees, that is easily exceeded, and wire mistakes happen.
Ask for a one-line reply to the payment email: amount received and date. Keep it with the draw record and the lien waiver. A receipt shows payment arrived; it does not show the work is done or that liens are released.
Making it routine
- Ask for a one-line confirmation of each payment.
- Record the amount and date.
- Keep it with the draw record.
- Remember that it is not a lien waiver.
Run your own numbers
Use the free fix-and-flip loan sizer below to see the amount at stake on a draw that must be traced.