Match the Wire Payee to the W-9 Before Every Draw

By DeskTech HQ · · 1 min read

A wire goes out to the account in an email, not the account on the W-9. The email was spoofed. A two-minute match of name and account to the W-9 and contract catches it. The question is how likely a wrong payee is for the match to pay.

The steps

  1. Price the match: minutes × the value of your time.
  2. Estimate the cost of a misdirected payment.
  3. Break-even chance = match cost ÷ misdirected-payment cost.
  4. Pair it with a callback (wire fraud prevention).

A worked example

Example (illustrative arithmetic, not predictions)

The match takes 2 minutes at $60 an hour: $2. A misdirected payment would cost $2,000 if not recovered. Every figure is a made-up round number.

Chance a wire has a wrong payee Expected loss avoided (chance × $2,000) Avoided − $2
0.05% $1 −$1
0.1% $2 $0 (break-even)
0.5% $10 +$8
1% $20 +$18

The match pays at a 0.1% chance of a wrong payee: $2 ÷ $2,000. Wire fraud aimed at construction payments is common enough to exceed it.

Compare the payee name and the account with the W-9 and the signed contract, never with an email. If the contractor changes accounts, confirm by calling a known number, not one in the message. If a wire goes wrong, call the bank at once and ask for advice.

Making it routine

  1. Compare payee and account with the W-9 and contract.
  2. Never rely on an email for account details.
  3. Confirm any change by calling a known number.
  4. Call the bank at once if a wire goes wrong.

Run your own numbers

Use the free fix-and-flip loan sizer below to see the amount at stake in a single draw wire.

Quick answers

What is the match?

Checking that the name and account on the wire match what the W-9 and contract say.

How do I price it?

The minutes times the value of your time.

What does a wrong payee cost?

A misdirected payment that may be hard to recover.

What is the break-even chance?

The check's cost divided by that cost.

Do the numbers in this guide apply to my draws?

No. The time, cost and odds are made up for the example. They are not predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.